![Weekly Newsletter – WEEK 14 Weekly Newsletter – WEEK 14](https://www.etc.cmu.edu/projects/athena/wp-content/uploads/2016/04/14-319x142.jpg)
Weekly Newsletter – WEEK 14
Monday began with the team getting the room and iPads ready for soft opening. Softs opening is a 4-5 hour time slot wherein various faculty
![Weekly Newsletter – WEEK 13 Weekly Newsletter – WEEK 13](https://www.etc.cmu.edu/projects/athena/wp-content/uploads/2016/04/LevelEditor-319x142.png)
Weekly Newsletter – WEEK 13
On Monday, Elaine worked remotely in Indiana on the lesson plan, two page contract as well as other documentation required. The rest of the team
![Weekly Newsletter – WEEK 12 Weekly Newsletter – WEEK 12](https://www.etc.cmu.edu/projects/athena/wp-content/uploads/2016/04/121-319x142.jpg)
Weekly Newsletter – WEEK 12
On Monday, the team began by sitting down and discussing the playtest that happened on Saturday. We categorized all the inputs given by children as