This week, we set up our schedule and revise our design to make the first design documentation, also, we
finished our branding materials, including posters, half-sheet and logo.
Schedule Timeline
We set up our brief timeline to help ourselves to manage our process and time to finish and polish our
work.After meeting with faculty, we adjust the schedule to make sure all the things get done before
soft-opening.
Design Documentation 1.0
After meeting with faculties and client we update our game mechanism design.In our previous concept, we assign the players different roles such as pilot and radar detector who’s game-play are boring. Also the information flow between players are too complex. We decide to combine our old concept 1 and 2 to simplify every role and add a lot role play game properties.
Branding Materials Done
We brain-stormed several ideas of our logo and poster and our artist tried different ideas out. After several days revising and redesigning we finally got our fascinate posters and logos.They are simple, meaningful and visually pleasing.