Weeks 15 and 16 (12/3 to 12/16): Final playthrough and wrapping up!
With the museum up and running, we worked on documents and instructions to hand off the class. These included a map of all the light switches and power sources in the space, instructions on how to set up, maintain and power down the Misty Window and Typewriter, as well as directions for running the soundscape Read more about Weeks 15 and 16 (12/3 to 12/16): Final playthrough and wrapping up![…]