Week 9 Newsletter

Week 9 (3/17 ~ 3/21)

Week 9 was non-existent

Unfortunately for most of us who were at GDC, we were not able to touch on the project too much. For the few who remained were able to get multiple things done. Once we return we will first focus on our Halves presentation which is on Monday. After that on Tuesday we will set up our sprint and plan our coming sprint.

CHALLENGES:

The biggest struggle was that we were not available this week because GDC was plotted right after spring break week. One of the main struggles we are still dragging is on the tech side where we are still without the actual controls. When we gain access to the controls, we will be able to playtest and figure out in depth if we are missing anything.

NEXT WEEK/SPRINT:

Next week is Halves. Because most of us attended GDC, we need to plan ahead and decide strongly on what needs to be done in preparation for Halves.

Hopefully by the end of Halves we will receive more information from our client about the whereabouts of controls.

 

Leave a Reply

Your email address will not be published. Required fields are marked *